Sample & Co Electrical is invented. The figures show how we work out the list. They are not results from a real client.
The firm
People: 15: 10 engineers, 3 in the office, 2 directors. Systems: Sage Accounting, Outlook, Excel, paper job sheets. It is a smaller version of the 30-person contractor in our full sample review.
The office spends most of its admin time on paperwork that arrives after the work is done: job sheets typed into Sage, hours copied for payroll, and quotes chased by hand.
How the half day works
We sit with the people who do the admin: the office manager, whoever raises invoices, and a director. For each task that comes round again and again, we ask how long it takes, how often it happens and how many people do it. We agree those figures with the team before we leave, and the written list shows the working line by line.
The three time-savers
1. Job sheets typed into Sage
Now: Engineers hand in paper job sheets at the end of the week. The office types each one into Sage to raise the invoice, and chases any that are missing or hard to read.
What we would change: A job sheet on each engineer's phone, with your price list built in. When a job is finished, the office checks a draft invoice in Sage and sends it. About 1.3 hours a week stays, for checking drafts before they go.
| Task | Each time | How often | Hours a week |
|---|---|---|---|
| Typing a job sheet into Sage | 5 minutes | 55 a week | 4.6 |
| Chasing a missing or unreadable sheet | 15 minutes | 5 a week | 1.3 |
| Time it takes now | 5.8 | ||
| After the change | 1.3 | ||
| Saved | 4.5 | ||
Would save: 4.5 hours a week. Fixed price: £3,950 + VAT. Timeline: 3 to 4 weeks.
2. Hours copied for payroll
Now: Engineers text their hours to the office manager, who copies them into a spreadsheet for the payroll bureau every Monday.
What we would change: Hours come from the job sheets above. A weekly summary goes to the payroll bureau automatically, with anything unusual flagged for a person to check.
| Task | Each time | How often | Hours a week |
|---|---|---|---|
| Copying one engineer's week | 8 minutes | 10 a week(10 engineers) | 1.3 |
| Checking and querying hours | 30 minutes | 1 a week | 0.5 |
| Time it takes now | 1.8 | ||
| After the change | 0.3 | ||
| Saved | 1.5 | ||
Would save: 1.5 hours a week. Fixed price: Included if built with time-saver 1, otherwise £2,500 + VAT. Timeline: 1 week, alongside time-saver 1.
3. Quotes chased by hand
Now: Sent quotes live in a spreadsheet. A week later, a director phones or emails each one to ask whether the customer wants to go ahead.
What we would change: Each quote is logged as it leaves Outlook. A polite follow-up email goes on day 7, and replies land in one list, so calls are only made to the customers who answer. About half an hour a week stays, for calls to the customers who reply.
| Task | Each time | How often | Hours a week |
|---|---|---|---|
| Finding and chasing a quote | 10 minutes | 12 a week | 2.0 |
| Time it takes now | 2.0 | ||
| After the change | 0.5 | ||
| Saved | 1.5 | ||
Would save: 1.5 hours a week. Fixed price: £2,500 + VAT. Timeline: 2 weeks.
The total
Together, about 7.5 hours a week, or about 390 hours a year. That is more than the 5 hours in our promise, and the firm has 8 or more staff, so this review would be invoiced.
If the three time-savers we find add up to less than 5 hours a week of staff time, there's no invoice. For firms with 8 or more staff. Hours are agreed with your team on the day and shown line by line.
What we would leave alone
- Building quotes in Excel. Each quote takes a director's judgement. A better template would help more than any software.
- Van stock lists. With 10 vans, paper lists checked monthly work well enough. A stock system would cost more time than it saves.
What the review costs
£750 + VAT. Founding rate £495 + VAT for our first 5 clients who book by 31 January 2027, in return for a short case study. The full fee comes off any build you sign within 60 days. More about the review.